Coastal Custom Builders
Live

Anderson Residence

47 Oceanview Drive, Camden, ME
Framing5 check-insStarted January 2026 Updates in real time

Build Progress

36%

Pre-ConstructionSite WorkFoundationFramingRoofingRough-InInsulationDrywallFinishesLandscapingComplete

Build Journal

February 7, 2026

Framing

4Partly cloudy · 28°F

Second floor walls are going up nicely. Crew is ahead of schedule. Trusses arrive Thursday. The view from the second floor is going to be incredible — you can see the harbor.

Second floor walls framed
Window openings framed
Roof trusses delivered
Sheathing started

February 3, 2026

Framing

6Clear sky · 22°F

First floor framing is complete. All load-bearing walls are in place and the inspector signed off on the floor system. Everything is looking great and we're right on schedule.

First floor walls framed
Load-bearing walls verified
Floor system inspected

Phase reached: Framing

January 30, 2026

January 28, 2026

Foundation

3Overcast · 31°F

Foundation walls are poured and curing. Backfill is scheduled for next week. We applied the waterproofing membrane on the exterior — this will keep you dry for decades.

Foundation walls poured
Waterproofing applied
Drainage tile installed
Backfill complete

January 20, 2026

Site Work

5Light snow · 25°F

Excavation is complete. Footings are dug and forms are set. Ready for concrete pour tomorrow morning. Weather is looking cooperative.

Excavation complete
Footing forms set
Gravel base compacted

January 10, 2026

Pre-Construction

2Mainly clear · 18°F

Permits are pulled, dumpster is delivered, and temporary power is set up. Tree clearing is done. We're ready to break ground next week!

Building permit obtained
Site staked out
Temporary power installed
Tree clearing complete

Selections

Materials and finishes chosen for your home.

Kitchen Countertop

Kitchen

Ordered

Cambria Brittanicca Warm

Exterior Siding

Exterior

Ordered

James Hardie Board — "Arctic White"

Master Bath Tile

Bathroom

Selected

Marble hexagon mosaic — Carrara

Front Door

Exterior

On Order

Therma-Tru Classic Craft — Mahogany

Hardwood Flooring

Interior

Selected

White Oak 5" wide plank — natural finish

Light Fixtures (Kitchen)

Kitchen

Needs Decision

Schoolhouse Electric — Satellite 6-arm

Documents

Permits, plans, and inspections shared by your builder.

Building Permit #2026-0142

Permit · January 8, 2026

Foundation Inspection Report

Inspection · January 29, 2026

Floor Plan — Final Rev

Plans · December 15, 2025

Elevation Drawings

Plans · December 15, 2025

Change Orders

Scope changes and their cost impact.

Add gas line to deck for future grill

January 22, 2026

+$1,850

Approved

Much easier to run the line now while walls are open. Would cost 3-4x after drywall.

Upgrade master shower to frameless glass

February 1, 2026

+$2,400

Approved

Swapping the standard shower door for a frameless glass enclosure. Lead time is 3 weeks.

Total change order impact+$4,250

Punch List

Items to address before final walkthrough.

Touch up paint — garage trim

Low priority

Open

Kitchen cabinet door alignment (pantry)

Medium priority

In Progress

Deck railing gap at north corner

Medium priority

Open